Exclusive Clare Burnett Mon 23 Nov 26
The 140-home project to rise on a surplus government site beside Murrumbeena Station is moving into construction…
Work on a 144-home mixed-use project by MAKE Property Group Work is moving ahead north-east of Melbourne at Murrumbeena Station.
The scheme will include 1200sq m of retail at the ground level.
Ironside, which was appointed to Goldfields’ $170-million Richmond tower earlier this year, has been tapped to build the Murrumbeena project.
At eight storeys, it is believed to be the tallest building in the suburb after the introduction of Train and Tram Zone Activity Centres last year.
The plans are an uptick on an initially proposed project of 110 apartments submitted in 2025 .
The 0.24ha site, acquired by the developer in 2023, is surplus government land used for the Murrumbeena Road Level Crossing Removal Project.
Designed by Fieldwork, there will be a mix of studio, one and two-bedroom apartments.
Amenities include a rooftop entertaining space, communal dining facilities, a resident lounge, co-working space, yoga and pilates studio, sauna, cold plunge, workshop, and dog wash.
The fully electric building will have rooftop solar, rainwater harvesting and electric vehicle charging.
MAKE said it sees the project as a “contemporary village, rather than a traditional apartment” with a pocket park surrounding a protected oak tree.
The now-approved application sought to rezone the site to commercial and remove the “redundant” Heritage Overlay.
The surrounding Murrumbeena Village received heritage protection in 2021. Development began in the area in the 1880s.
MAKE managing director Matt Ablethorpe said the team had put a lot of thought into how Murrumbeena Place would function as a residential community.
“Melbourne has invested significantly in improving its transport network, and projects such as Murrumbeena Place help to build on that ... by delivering homes that are easily connected to transport, employment, education and everyday amenity,” Ablethorpe said.
The area surrounding Murrumbeena station was designated an activity centre under the Victorian Government’s Plan for Victoria strategy.
Construction on Murrumbeena Place is expected to begin before the end of the year.
Explore more: Construction Commencement , Co-working , Design Reveal , Development Applications , Energy Efficiency , Green Buildings , Heritage Protection , Melbourne , South-Eastern Suburbs , Public Transport , Real Estate , Renewable Energy , Residential , Transit-Oriented Development , Victoria , Zoning & Density