Trending
Prev Story
Next Story

Rs 3-4 billion needed to rebuild flood-damaged Beni-Jomsom-Korala road

The Himalayan Times •
October 20, 2026 • 06:10 AM
• By THT Online
1
1 reads 0 reactions

An estimated Rs 3 billion to Rs 4 billion will be required to restore the Beni-Jomsom-Korala road after floods, landslides and river erosion damaged sections of the highway in late September.

Rs 3-4 billion needed to rebuild flood-damaged Beni-Jomsom-Korala road

An estimated Rs 3 billion to Rs 4 billion will be required to restore the Beni-Jomsom-Korala road after floods, landslides and river erosion damaged sections of the highway in late September.

Tejashwi Sharma, chief of the Beni-Jomsom-Korala Road Project, said the Kaligandaki River swept away or destroyed road sections at 10 locations, while landslides damaged 50 others following heavy rainfall from September 24 to 27.

Although initial repairs restored traffic within two weeks, the road's full reconstruction will require substantially more funding, Sharma said. The work will include river and landslide control measures and upgrading the pavement in Myagdi's road section, where the existing surface treatment needs improvement.

The 202-kilometre road connects Maldhunga in Parbat through Beni in Myagdi to the Korala border crossing in Mustang. The 33-kilometre section in Myagdi suffered the heaviest damage, with erosion and landslides affecting both previously vulnerable areas and new locations.

Narendra Subedi, chief of the Federal Road Inspection Office in Pokhara and the project's founding chief, said the road had sustained its most extensive damage since construction began in fiscal year 2016-17. He said the recently upgraded section in Myagdi had been particularly badly affected.

Prev Swipe Story Next

Same Story from Other Publications

Compare how 6 other independent news outlets reported on this story.

6 Publications
Hamro Patro News
1w ago
Snowfall hampers transportation goods through Korala border point

Snowfall hampers transportation goods through Korala border point

POKHARA, Nov 5: The Beni-Jomsom section of the Kaligandaki Corridor remained obstructed for an extended period last month after floods and landslides severely damaged the road.

#beni #korala #floods
Compare →
The Guardian
11h ago
Storm Charles causes floods and flight cancellations across southern Europe

Storm Charles causes floods and flight cancellations across southern Europe

Heavy rain and strong winds have also caused disruption across British Columbia, Canada, over the last week

#floods #flood
Compare →
Al Jazeera English
2d ago
As Gaza floods subside, Palestinians assess human and material damage

As Gaza floods subside, Palestinians assess human and material damage

A deadly sandbank collapse buried families alive in Deir el-Balah, as survivors describe desperate rescue attempts.

#floods #flood
Compare →
BBC News
3d ago
Board of Peace says Israel's aid response after Gaza floods 'insufficent'

Board of Peace says Israel's aid response after Gaza floods 'insufficent'

The group, formed by Trump, issues rare criticism of Israel, while also blaming Hamas for the suffering of civilians in Gaza.

#floods #flood
Compare →
The Kathmandu Post
5d ago
From flood-hit areas to crime scenes, Nepal’s police dogs sniff out vital clues

From flood-hit areas to crime scenes, Nepal’s police dogs sniff out vital clues

One of 107 dogs in the police force, Leo located two bodies and human remains during a 20-day search after the Bhotekoshi floods.

#floods #flood
Compare →
CNN International
1w ago
#river #flood
Compare →

Related Stories

National (Nepal)
Build #2611