Trending
Prev Story
Next Story

Snowfall hampers transportation goods through Korala border point

Hamro Patro News •
November 06, 2026 • 12:08 PM
2
2 reads 0 reactions

POKHARA, Nov 5: The Beni-Jomsom section of the Kaligandaki Corridor remained obstructed for an extended period last month after floods and landslides severely damaged the road.

1 / 2
Swipe Photos

POKHARA, Nov 5: The Beni-Jomsom section of the Kaligandaki Corridor remained obstructed for an extended period last month after floods and landslides severely damaged the road.

Read full story at source ( myrepublica.nagariknetwork.com )

Prev Swipe Story Next

Same Story from Other Publications

Compare how 1 other independent news outlet reported on this story.

1 Publication
The Kathmandu Post
1w ago
Floods push back Siddhababa tunnel opening to mid-January

Floods push back Siddhababa tunnel opening to mid-January

The Bhotekoshi and Kaligandaki floods disrupted the delivery of electrical and safety equipment, delaying plans to open the tunnel to traffic.

#kaligandaki #floods
Compare →

Related Stories

Sports
Build #2611