Trending
Prev Story
Next Story

Upper Tamakoshi Hydropower Limited has posted a net profit of Rs 1.65 billion and published its 1st quarter company analysis of the fiscal year 2083/84.

ShareSansar •
December 15, 2016 • 10:55 AM
13
13 reads 0 reactions

|| ShareSansar || Upper Tamakoshi Hydropower Limited has posted a net profit of Rs 1.65 billion and published its 1st quarter company analysis of the fiscal year 2083/84.

Upper Tamakoshi Hydropower Limited has posted a net profit of Rs 1.65 billion and published its 1st quarter company analysis of the fiscal year 2083/84.

Upper Tamakoshi Hydropower Limited has posted a net profit of Rs 1.65 billion and published its 1st quarter company analysis of the fiscal year 2083/84.

Prev Swipe Story Next

Same Story from Other Publications

Compare how 3 other independent news outlets reported on this story.

3 Publications
Hamro Patro News
11h ago
Nepal and India advance 669 MW Lower Arun Hydropower Project

Nepal and India advance 669 MW Lower Arun Hydropower Project

KATHMANDU, Nov 23: Nepal and India have taken a significant step towards advancing the 669-megawatt (MW) Lower Arun Hydropower Project, with Prime Ministers Balen Shah and Narendra Modi jointly lay...

#hydropower
Compare →
The Himalayan Times
6d ago
Beyond hydropower: Rethinking Nepal's energy security after the Bhotekoshi disaster

Beyond hydropower: Rethinking Nepal's energy security after the Bhotekoshi disaster

Nepal stands at a critical turning point in its energy development journey. Over the past decade, the country has made significant progress in hydropower development, electricity access and private-sector investment. However, the devastating Bhotekoshi disaster of August 2026 has exposed a fundamental weakness in our energy strategy: increasing generation capacity alone does not guarantee energy security.

#hydropower
Compare →
The Kathmandu Post
6d ago
Nepal considers stricter IPO rules for hydropower projects

Nepal considers stricter IPO rules for hydropower projects

A draft amendment would require projects to complete at least 50 percent of construction before issuing shares, drawing mixed reactions from investors and developers.

#hydropower
Compare →

Related Stories

Opinion & Editorial
Build #2621