Trending
Prev Story
Next Story

Border Crossings Remain Closed Due to Natural Obstacles and Geopolitical Concerns

Hamro Patro News •
October 30, 2026 • 11:16 AM
1
1 reads 0 reactions

Kathmandu. The Rasuwagadhi border crossing was closed on Bhadra 10 due to floods in the Bhote Koshi River. The Korala border crossing in Mustang was obstructed on Assoj 9 by rainfall. China does no...

1 / 2
Swipe Photos

Kathmandu. The Rasuwagadhi border crossing was closed on Bhadra 10 due to floods in the Bhote Koshi River. The Korala border crossing in Mustang was obstructed on Assoj 9 by rainfall. China does not appear to be in a position to immediately operate the remaining Tatopani border crossing.

The Tatopani border crossing, which was opened for three days during Dashain, has now been closed again. There is no decision on when that border crossing will open. Sindhupalchok's Assistant Chief District Officer Krishna Prasad Sharma said that the border crossing is currently not in operation because the Chinese side is working at the site of the Kodari (Eco) landslide.

Read full story at source ( english.ratopati.com )

Prev Swipe Story Next

Same Story from Other Publications

Compare how 1 other independent news outlet reported on this story.

1 Publication
The Himalayan Times
1w ago
International assistance for flood disaster in Nepal: Need of introducing outcome-based education for its efficacy

International assistance for flood disaster in Nepal: Need of introducing outcome-based education for its efficacy

is very heartening to know that Nepal has been promised $ 20 million for the reconstruction of the Bhote Koshi Flood by the Fund for responding to Loss and Damage (FRLD). It was created in 2022 as a new financial instrument.

#bhote #koshi
Compare →

Related Stories

Technology
Build #2611