Trending
Prev Story
Next Story

Tamang Heritage Trail and Ruby Valley Trail Reopen for Tourists

Hamro Patro News •
October 24, 2026 • 04:00 PM
1
1 reads 0 reactions

Kathmandu. The Tamang Heritage Trail located in Rasuwa and the Ruby Valley Trail located in Dhading have been opened for tourists. The trail, which was damaged by the flood in the Bhote Koshi River...

Tamang Heritage Trail and Ruby Valley Trail Reopen for Tourists

Kathmandu. The Tamang Heritage Trail located in Rasuwa and the Ruby Valley Trail located in Dhading have been opened for tourists. The trail, which was damaged by the flood in the Bhote Koshi River in Rasuwa on Bhadra 10, has been opened for tourists after the construction of a temporary footbridge over the Bhote Koshi River in Syabrubesi.

Balram Neupane, Chairman of the Rasuwa-Nuwakot Tourism Society, informed that the trail has been opened for tourists after the construction of a temporary bridge for movement in Syabrubesi, which was damaged by the Bhote Koshi flood.

Read full story at source ( english.ratopati.com )

Prev Swipe Story Next

Same Story from Other Publications

Compare how 1 other independent news outlet reported on this story.

1 Publication
The Himalayan Times
1w ago
International assistance for flood disaster in Nepal: Need of introducing outcome-based education for its efficacy

International assistance for flood disaster in Nepal: Need of introducing outcome-based education for its efficacy

is very heartening to know that Nepal has been promised $ 20 million for the reconstruction of the Bhote Koshi Flood by the Fund for responding to Loss and Damage (FRLD). It was created in 2022 as a new financial instrument.

#bhote #koshi
Compare →

Related Stories

Technology
Build #2612